Method for fabricating rib-stiffened composite structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8435375
SERIAL NO

13559559

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for fabricating a grid-stiffened structure from fiber-reinforced composite materials. A skin is applied to a smooth, hard base tool. Ribs comprised of carbon-fiber tows are formed on the skin, and shallow cavities are formed between the ribs and the skin. An expansion block is placed in each of the cavities, and is held in place by an elastomeric contact adhesive having adhesive properties that are substantially diminished when the adhesive is heated to an elevated curing temperature. The assembly is then autoclave cured. After cooling, the formed structure is separated from the base tool and the expansion blocks are removed from the cavities. A grid-stiffened sandwich structure is formed by applying an outer skin over the ribs and expansion blocks, before curing the assembly. After cooling, the outer skin is removed to allow extraction of the blocks, and subsequently bonded to the ribs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES AS REPRESENTED BY THE SECRETARY OF THE AIRFORCEWASHINGTON DC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ganley, Jeffrey M Albuquerque, US 4 32
Johnson, Brice A Federal Way, US 45 601
Van, West Barry P Bellevue, US 12 541
Wegner, Peter M Tijeras, US 4 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00