Mould for moulding a container obtained from a parison of plastic material and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8431069
APP PUB NO 20120161370A1
SERIAL NO

13140354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Mold (1) for molding a container (2) obtained from a parison (3) of plastic material/ comprising: two half-molds (4); means (5) for moving said half-molds (4) between a closed position in which said half-molds (4) define a cavity (6) for housing the parison (3) or the molded container (2), and an open position in which said half-molds (4) are moved away from each other to enable the extraction of the molded container (2) from the cavity (6) or the insertion of another parison (3) in said cavity (6); two jaws (7) movable between a configuration' of engagement and a configuration of disengagement with the parison (3) or the container (2) located in said cavity (6), said half-molds (4) defining an inner portion (9) of the mold (1) that is complementarily shaped relative to an outer profile (10) of the jaws (7) in such a way that said jaws (7) are enclosed, at least partially, by said half-molds (4).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GEA PROCOMAC S.P.A.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dordoni, Claudio Parma, IT 4 31
Troadec, Bernard Pornic, FR 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00