Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8166596
APP PUB NO 20080301889A1
SERIAL NO

12133974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A construction method for a girder in a bridge in which a plurality of piers are installed in an interval in a longitudinal direction of the bridge, a plurality of copings are installed on the piers, and a plurality of girders respectively installed between the piers are installed on the copings. The method comprises the steps of: installing at least one temporary girder on a front coping of the copings and a rear coping adjacent to the rear coping of the copings; installing a crane for pulling up a girder having a girder pulling up space therein guided by the temporary girder; and providing with a girder by a pre-cast method so as to install a girder on the front coping and the rear coping.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG C&T CORPORATION26 SANGIL-RO 6-GIL GANGDONG-GU SEOUL 05288

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kang, Dong-Ok Kwacheon, KR 2 15
Kim, Yeong-Seon Dubai, AE 4 19
Shin, Hyun-Yang Seoul, KR 2 15
Yoon, Man-Geun Sungnam, KR 2 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation