Ammunition assembly with alternate load path
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Mar 20, 2012
Grant Date -
Aug 11, 2011
app pub date -
Mar 29, 2011
filing date -
Apr 7, 2006
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
An ammunition round assembly with alternate load path is disclosed herein. The ammunition round assembly includes a projectile, a body engaging the projectile, and a non-combustible base at least partially enclosing the body. A structural member having first and second engagement portions opposite to each other is positioned inside an interior space defined by the body and the base. The first engagement portion firmly engages the base, and the second engagement portion firmly engages the projectile to provide an alternate load path between the projectile and the base.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
GOLDMAN SACHS BANK USA AS SUCCESSOR COLLATERAL AGENT | 200 WEST STREET NEW YORK NY 10282 |
International Classification(s)

- 2011 Application Filing Year
- F42B Class
- 290 Applications Filed
- 235 Patents Issued To-Date
- 81.04 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Mutascio, Enrico R | Palm Springs, US | 16 | 133 |
# of filed Patents : 16 Total Citations : 133 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- F42B Class
- 8.90 % this patent is cited more than
- 13 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
