Resource management and planning for manufacturing organizations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8126754
SERIAL NO

10996712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for managing manufacturing resources and planning manufacturing activities includes tracking enterprise information detailing business records for an enterprise, the enterprise information including real-time information regarding resources, production, and inventory related to production of a product; communicating with a resource management system storing the enterprise information and multiple affiliated organizations using disparate protocols; translating communications between the protocols to facilitate transfer of data between the resource management system and the affiliated organizations; loading selected portions of the enterprise information into a scaled memory; and generating, in real-time, production plans based on the selected portions of the enterprise information loaded into the scaled memory to affect manufacturing and shipping of goods and materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRESCENTONE INC200 CONTINENTAL BLVD 3RD FLOOR EL SEGUNDO CA 90245

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brearley, Quentin Stewart Rancho Palos Verdes, US 6 79
Nakasu, Yuji Rancho Palos Verdes, US 1 1
Tamura, Hajime Fuchu, JP 56 798

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation