Shredder support and waste receptacle
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Feb 1, 2011
Grant Date -
Mar 6, 2008
app pub date -
Aug 29, 2006
filing date -
Aug 29, 2006
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
The present invention relates generally to the support system and waste receptacles for shredders. By removing certain supports in a shredder, the waste receptacle can be enlarged. In addition, openings in the shredder support walls allow the size of the waste receptacle to be increased, as well as facilitate disposal of other waste through the opening.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MICHILIN PROSPERITY CO LTD | 5F 11 SANNING ST SANCHUNG CITY TAIPEI HSIEN 241 |
International Classification(s)

- 2006 Application Filing Year
- B02C Class
- 291 Applications Filed
- 181 Patents Issued To-Date
- 62.20 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Wang, Tie Chun | Taipei, TW | 27 | 80 |
# of filed Patents : 27 Total Citations : 80 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- B02C Class
- 9.77 % this patent is cited more than
- 14 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
