Method for producing structures
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 27, 2009
Grant Date -
Jun 16, 2005
app pub date -
Dec 10, 2003
filing date -
Dec 10, 2003
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A process for making microporous structures that can be used as a catalyst support. The microporous structures have high porosity and high thermal stability, combined with good mechanical strength and relatively high surface area. The process is useful for making titanium dioxide for catalyst structures for use for fuel cells, sensors, electrochemical cells and the like.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ALSHER TITANIA LLC | 1768 EAST 25TH STREET CLEVELAND OH 44114 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Sabacky, Bruce James | Reno, US | 5 | 102 |
# of filed Patents : 5 Total Citations : 102 | |||
Spitler, Timothy Malcome | Fernley, US | 21 | 212 |
# of filed Patents : 21 Total Citations : 212 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B01J Class
- 0 % this patent is cited more than
- 16 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
