Device for detecting water in product-only pump flow stream
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Mar 25, 2008
Grant Date -
Sep 29, 2005
app pub date -
Mar 28, 2005
filing date -
Mar 26, 2004
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A device for detecting the presence of water in a product-only hydrocarbon pump system particularly used for the removal of subterraneous hydrocarbons from a remediation site through a well. The device comprises a sealed float switch chamber, positioned either upstream or downstream from the hydrocarbon pump, wherein when a threshold amount of water is present in the hydrocarbon product being pumped through the float chamber, a switch is actuated by the float mechanism, electrically signaling an alarm, shutting off the power supply to the pump, or further activating a system controller or log.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
GENERAL ELECTRIC CAPITAL CORPORATION AS SUCCESSOR ADMINISTRATIVE AGENT | 500 MONROE STREET CHICAGO IL 60661 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bamm, Craig A | Ann Arbor, MI | 1 | 3 |
# of filed Patents : 1 Total Citations : 3 | |||
Fischer, David A | Ann Arbor, MI | 23 | 723 |
# of filed Patents : 23 Total Citations : 723 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 3 Citation Count
- E21B Class
- 1.55 % this patent is cited more than
- 17 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Oct 21, 2024 | STCH | INFORMATION ON STATUS: PATENT DISCONTINUATION | free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
Oct 21, 2024 | LAPS | LAPSE FOR FAILURE TO PAY MAINTENANCE FEES | free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
Sep 13, 2024 | FP | LAPSED DUE TO FAILURE TO PAY MAINTENANCE FEE | Effective Date: Sep 13, 2024 |
May 06, 2024 | FEPP | FEE PAYMENT PROCEDURE | free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY |
Dec 17, 2019 | MAFP | MAINTENANCE FEE PAYMENT | free format text: PAYMENT OF MAINTENANCE FEE, 4TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2551); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY year of fee payment: 4 |
Sep 13, 2016 | I | Issuance | |
Aug 24, 2016 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Aug 09, 2016 | ZAAA | NOTICE OF ALLOWANCE AND FEES DUE | free format text: ORIGINAL CODE: NOA |
Aug 09, 2016 | ZAAB | NOTICE OF ALLOWANCE MAILED | free format text: ORIGINAL CODE: MN/=. |
May 19, 2016 | P | Published | |
Mar 25, 2015 | F | Filing | |
Feb 26, 2015 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WU, MEI-LI;CHAUNG, HSO-CHI;KE, GUAN-MING;REEL/FRAME:035293/0248 Owner name: NATIONAL PINGTUNG UNIVERSITY OF SCIENCE AND TECHNO Effective Date: Feb 26, 2015 |
Nov 19, 2014 | PD | Priority Date |

Matter Detail

Renewals Detail
