Dynamic baselining in current modulation-based communication
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Mar 25, 2008
Grant Date -
Oct 5, 2006
app pub date -
Oct 22, 2005
filing date -
Jul 15, 2003
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
Dynamic baselining of current modulation-based talkback from a slave device to a master device in a system such as an electronic blasting system, wherein the dynamic baselining enhances communication integrity under conditions of environmental noise and the like. With a data packet of appreciable length, the dynamic baselining is preferably performed repeatedly on the bytes or words within the packet.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AUSTIN STAR DETONATOR COMPANY | 25800 SCIENCE PARK DRIVE CLEVELAND OH 44122 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Jennings, III David T | Santa Barbara, CA | 9 | 163 |
# of filed Patents : 9 Total Citations : 163 | |||
Teowee, Gimtong | Westlake Village, CA | 45 | 2426 |
# of filed Patents : 45 Total Citations : 2426 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
