Processing system for manufacturing composite cementitious materials with reduced carbon dioxide emissions
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 10, 2007
Grant Date -
Nov 17, 2005
app pub date -
Jun 7, 2004
filing date -
May 13, 2004
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A processing arrangement for manufacturing composite cementitious materials, such as hydraulic blended cements, with significantly reduced Portland clinker minerals content. The arrangement includes a milling unit for pregrinding supplementary cementitious materials and highly reactive pozzolans or mineral fillers, such as fly ash, blast furnace slag, fine quartz, granitic quarry fines, and the like, and a milling unit for pregrinding the Portland cement. The pregrinding units are followed by grinding unit for grinding the preground components. The pregrinding units are adapted to work as an open circuit or as a closed circuit for the material being ground.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
PROCEDO ENTERPRISES ETABLISSSEMENT | POSTFACH 583 VADUZ FL-9490 |
International Classification(s)

- 2004 Application Filing Year
- B02C Class
- 266 Applications Filed
- 136 Patents Issued To-Date
- 51.13 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ronin, Vladimir | Lulea, SE | 8 | 142 |
# of filed Patents : 8 Total Citations : 142 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 18 Citation Count
- B02C Class
- 74.89 % this patent is cited more than
- 18 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
