Multi-element connector
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
May 30, 2006
Grant Date -
Feb 10, 2005
app pub date -
Aug 5, 2003
filing date -
Aug 5, 2003
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
An apparatus such as a connector or circuit includes a substrate having a plurality of conductive members and a plurality of non-conductive members. The conductive members include a plurality of conductive fibers in association with a polymer material. The conductive members and the non-conductive members are disposed in the substrate member and are selectively situated with respect to each other forming a modular matrix configuration of contacts suitable for an array or association with other circuitry.
First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
XEROX CORPORATION | 201 MERRITT 7 NORWALK CT 06851-1056 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Swift, Joseph A | Ontario, NY | 109 | 1373 |
# of filed Patents : 109 Total Citations : 1373 | |||
Wallace, Stanley J | Victor, NY | 53 | 833 |
# of filed Patents : 53 Total Citations : 833 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Legal Events

Matter Detail

Renewals Detail
