Industrial truck
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Feb 21, 2006
Grant Date -
Jul 8, 2004
app pub date -
Sep 12, 2003
filing date -
Sep 13, 2002
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
An industrial truck, such as a fork-lift truck, has an electrical drive system and an energy supply based on gaseous media. At least one pressure vessel for the storage of at least one gaseous medium is installed in a mounting device which can be easily replaced together with the pressure vessel in the lower portion of the industrial truck (5) between the axles (7). Devices necessary for the generation of electrical energy from the gaseous medium can be advantageously installed in the mounting device.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
STILL GMBH | BERZELIUSSTRASSE 10 HAMBURG 22113 |
International Classification(s)

- 2003 Application Filing Year
- B60K Class
- 900 Applications Filed
- 342 Patents Issued To-Date
- 38 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Leifert, Torsten | Gögelsen, DE | 12 | 86 |
# of filed Patents : 12 Total Citations : 86 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 8 Citation Count
- B60K Class
- 0.77 % this patent is cited more than
- 19 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
