Tubular honeycomb articles for use in energy absorption
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Apr 12, 2005
Grant Date -
Nov 27, 2003
app pub date -
May 22, 2002
filing date -
May 22, 2002
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A tubular honeycomb article for use in absorbing energy. The article is made by taking a planar honeycomb and forming it into a tube shaped honeycomb body. The tube shape of the honeycomb body is retained by providing a shell around the perimeter of the honeycomb body. The resulting tubular honeycomb article may be used as an insert or collar in automotive steering columns to provide absorption of energy during occupant loading in an frontal crash.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
HEXCEL CORPORATION | 281 TRESSER BLVD TWO STAMFORD PLAZA 16TH FLOOR STAMFORD CT 06901 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Banyas, George | San Leandro, CA | 1 | 5 |
# of filed Patents : 1 Total Citations : 5 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 3 Citation Count
- B62D Class
- 0.96 % this patent is cited more than
- 20 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
