Method for laying electrical cables from a first offshore wind power plant to a second offshore wind power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 6425708
SERIAL NO

09868970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for laying electrical cables from a first offshore wind power plant to a second offshore wind power plant. The method comprises placing the cable to be laid in the tower or the foundation of the first offshore wind power plant before the plant is erected, erection of the first offshore wind power plant, taking a tow line from one wind power plant to the other wind power plant, and drawing the leading end of the cable from the first wind power plant to the second wind power plant while releasing the cable from the tower or the foundation component of the first wind power plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AERODYNE ENGINEERING GMBHPROVIANTHAUS-STRASSE 9 D-24768 RENDSBURG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Siegfriedsen, Sonke Friedrichstadt, DE 24 231

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation