MRP system with viewable master production schedule

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 6119102
SERIAL NO

08787253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An MRP system that operates on a single data set containing records for all item demands and supplies. The file may be opened under a demand alias and a supply alias to expedite MRP regeneration. A second item master extension file includes data for each item which is subject to MRP, which further contributes to improved MRP regeneration time. Item low level codes for an item are recalculated in real time whenever a bill of material referencing the item is created or modified. Therefore, low level codes need not be calculated during MRP regeneration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APTEAN INC1155 PERIMETER CENTER WEST SUITE 700 ATLANTA GA 30338

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kiefus, Herman J Lafayette, IN 4 298
Rush, Gary W Lafayette, IN 4 298

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation