Method for increasing the proportion of a crystalline organic compound which remains uncrystallized in a composite particulate product and suppressing recrystallization
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 9, 1994
Grant Date -
N/A
app pub date -
Mar 20, 1992
filing date -
Mar 26, 1991
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A method for increasing the proportion of a crystalline organic compound which remains amorphous and suppressing recrystallization in which a crystalline organic compound and a hydrophilic polymer substance are fixed onto a surface of core particles by means of impacts applied in a high velocity gas stream. The solubility and stability of the resulting composite product, such as a drug for internal use, can be improved.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
NARA MACHINERY CO LTD | 2-5-7 JONAN-JIMA OHTA-KU TOKYO 1430002 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ishizaka, Takafumi | Tokyo, JP | 1 | 4 |
# of filed Patents : 1 Total Citations : 4 | |||
Kikuchi, Yuji | Tokyo, JP | 63 | 982 |
# of filed Patents : 63 Total Citations : 982 | |||
Koishi, Masumi | Sagamihara, JP | 10 | 222 |
# of filed Patents : 10 Total Citations : 222 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 4 Citation Count
- B01J Class
- 4.20 % this patent is cited more than
- 31 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
