Drop frame trailer construction
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 24, 1990
Grant Date -
N/A
app pub date -
Nov 30, 1988
filing date -
Nov 30, 1988
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A drop frame floor assembly for use in a trailer or other such vehicle which includes a frame assembly, a floor assembly and a lift assembly. The lift is connected to the frame for elevating and lowering the floor assembly with respect to the frame. The lift includes first and second scissor assemblies secured between the frame and floor assembly and hydraulic actuators for actuating the scissor assembly.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
WABASH NATIONAL CORPORATION | 1000 SAGAMORE PARKWAY SOUTH LAFAYETTE IN 47905 |
International Classification(s)

- 1988 Application Filing Year
- B60P Class
- 189 Applications Filed
- 1 Patents Issued To-Date
- 0.53 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ehrlich, Rodney P | 1903 Tippecanoe Springs Rd., Monticello, IN 47960 | 99 | 2331 |
# of filed Patents : 99 Total Citations : 2331 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 32 Citation Count
- B60P Class
- 0 % this patent is cited more than
- 35 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
