Fluidizing a lime-silica slag
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Oct 17, 1989
Grant Date -
N/A
app pub date -
Sep 12, 1988
filing date -
Sep 12, 1988
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A method of fluidizing a cold lime-silica slag covering a molten metal. An acid flux is prepared from a particulate admixture of sodium fluoroaluminate and sodium silicate. The flux is mixed with the cold slag forming a fluid slag having at least 1% by weight F- and at least 1% by weight Na.sub.2 O. The treated slag has a reduced melting point allowing it to be mechanically skimmed from the molten metal and has a high sulfur capacity.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ARMCO STEEL COMPANY L P A DE LIMITED PARTNERSHIP | 703 CURTIS STREET MIDDLETOWN OH 45043 |
International Classification(s)

- 1988 Application Filing Year
- C21C Class
- 68 Applications Filed
- 0 Patents Issued To-Date
- 0 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Lowry, Michael L | Middletown, OH | 1 | 3 |
# of filed Patents : 1 Total Citations : 3 | |||
Niedringhaus, Joyce C | Middletown, OH | 5 | 16 |
# of filed Patents : 5 Total Citations : 16 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 3 Citation Count
- C21C Class
- 0 % this patent is cited more than
- 36 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
