System for economic unit load distribution during process load transition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 4745758
SERIAL NO

06942947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a plant including a multiplicity of energy conversion units which together supply load upon demand to a given process through a common junction, a system is included to economically optimize the load distribution among the multiple units dynamically during the transition of process load demand from one state to another such that when the process load supply reaches the other process demand state, the energy conversion units are substantially in their economically optimum individual load generating states. Typical unit load dispatching plants may include a boiler house in which a multiplicity of boilers are coupled to a common header for supplying stream flow to the particular process, a power turbogeneration system in which a multiplicity of turbogenerating units supply power to a power system network through a common bus and a heat exchange industrial process in which a multiplicity of power-driven compressors are used together with corresponding chiller units for maintaining the temperature of a common coolant under varying coolant flow demand conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMERSON PROCESS MANAGEMENT POWER & WATER SOLUTIONS INC200 BETA DRIVE PITTSBURGH PA 15238

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gundersen, Katherine A Chicago, IL 2 41
Putman, Richard E Penn Hills Twp., Allegheny County, PA 12 511

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation