Method for covering cables with sheaths for corrosion protection and/or aesthetics
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Feb 11, 1986
Grant Date -
N/A
app pub date -
Jul 16, 1984
filing date -
Jul 16, 1984
priority date (Note) -
Expired
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A method of fitting a generally cylindrical corrosion protective and/or aesthetic sheath on a cable, which method includes the steps of fitting a sheath unit on one end of a cable; shifting the position of the fitted sheath unit toward the other end of the cable; fitting a fresh sheath unit similarly on the cable in continuation from the preceding sheath unit; and repeating the fitting of a fresh sheath unit and the shift of the preceding sheath until the cable is covered with the sheath units substantially over the entire length thereof.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SHINKO KOSEN KOGYO KABUSIKI KAISA 2 DOI-CHO 7-CHOME AMAGASAKI-SHI HYOGO-KEN JAPAN | Not Provided |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Haraguchi, Toshio | Ibaraki, JP | 1 | 11 |
# of filed Patents : 1 Total Citations : 11 | |||
Tanaka, Yoshito | Suita, JP | 166 | 2083 |
# of filed Patents : 166 Total Citations : 2083 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 11 Citation Count
- B32B Class
- 0 % this patent is cited more than
- 39 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
