CONTACTOR WITH ARC GUIDES AND PROTECTION INTEGRATED INTO THE ARC GUIDES, CORRESPONDING SYSTEM AND AIRCRAFT
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Apr 10, 2025
app pub date -
Jan 12, 2023
filing date -
Jan 12, 2023
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A contactor including a first electrical contact, a second electrical contact, and a movable bridge displaceable between a closed position and an open position, the contactor further including: a lower arc guide including a first portion connected to the first electrical contact, and a second portion connected to the second electrical contact, an upper arc guide including a first portion facing the first portion of the lower arc guide, a second portion facing the second portion of the lower arc guide, and a fuse connecting the first portion and the second portion of the upper arc guide.
First Claim
all claims..Other Claims data not available
Family
Country | kind | publication No. | Filing Date | Type | Sub-Type |
---|---|---|---|---|---|
FR | B1 | FR3131976 | Jan 18, 2022 | Patent | Grant |
Type : Patent Sub-Type : Grant | |||||
PATENT OF INVENTION (SECOND PUBLICATION) | Contacteur avec guides d’arc et protection intégrée aux guides d’arc, système et aéronef correspondant | Jun 14, 2024 | |||
EP | A1 | EP4466726 | Jan 12, 2023 | Patent | Application |
Type : Patent Sub-Type : Application | |||||
APPLICATION PUBLISHED WITH SEARCH REPORT | CONTACTEUR AVEC GUIDES D'ARC ET PROTECTION INTEGREE AUX GUIDES D'ARC, SYSTEME ET AERONEF CORRESPONDANT | Nov 27, 2024 | |||
CN | A | CN118613890 | Jan 12, 2023 | Patent | Application |
Type : Patent Sub-Type : Application | |||||
UNEXAMINED APPLICATION FOR A PATENT FOR INV. | Contactor with arc rail and integrated protection to arc rail, corresponding system and aircraft | Sep 06, 2024 | |||
WO | A1 | WO2023139325 | Jan 12, 2023 | Patent | Application |
Type : Patent Sub-Type : Application | |||||
INTERNATIONAL APPLICATION PUBLISHED WITH INTERNATIONAL SEARCH REPORT | CONTACTEUR AVEC GUIDES D'ARC ET PROTECTION INTEGREE AUX GUIDES D'ARC, SYSTEME ET AERONEF CORRESPONDANT | Jul 27, 2023 |
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SAFRAN ELECTRICAL & POWER | BLAGNAC FRANCE BLAGNAC HAUTE-GARONNE |
International Classification(s)

- 2023 Application Filing Year
- B64D Class
- 1674 Applications Filed
- 450 Patents Issued To-Date
- 26.89 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
BELTAN, Cecil | Moissy-Cramayel, FR | 6 | 0 |
# of filed Patents : 6 Total Citations : 0 | |||
ENOUF, Kévin | Moissy-Cramayel, FR | 6 | 0 |
# of filed Patents : 6 Total Citations : 0 | |||
PRIEUR, Guillaume | Moissy-Cramayel, FR | 6 | 0 |
# of filed Patents : 6 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B64D Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Oct 10, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Oct 10, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 10, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
