INCREASING PRODUCTION FROM WATER WELLS

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20250101720A1
SERIAL NO

18828880

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of increasing production from at least one target wellbore can include drilling at least one offset wellbore having at least one horizontal portion in at least one aquifer, and intersecting the target wellbore with the offset wellbore. A water well system for improved production from at least one target wellbore can include at least one offset wellbore, the offset wellbore including at least one horizontal portion positioned in at least one aquifer, and at least one intersection between the offset wellbore and the target wellbore. Ranging equipment in the target and/or offset wellbore may be used to steer a coiled tubing drilling BHA in the offset wellbore toward the target wellbore.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THRU TUBING SOLUTIONS INC2033 NORTH MAIN STREET NEWCASTLE OK 77056

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
ARISS, Steven A Boyers, US 2 0
FERGUSON, Andrew M Moore, US 78 1407
GIACALONE, Philippe Mount Pleasant, US 3 2
GOODSPEED, Micah Oklahoma City, US 1 0
GREENLY, Richard C Edmond, US 1 0
MENARD, Toby New Orleans, US 3 0
ROWCLIFFE, Nigel Mount Pleasant, US 4 2
SCHULTZ, Roger L Ninnekah, US 299 9082

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation