BULK DATA PROCESSING SYSTEM
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Mar 20, 2025
app pub date -
Dec 3, 2024
filing date -
Dec 3, 2024
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The system allows real time collection and processing of massive data from many network elements. It has an elastic architecture that scales horizontally to support different network sizes. The system in a uniform data format for downstream consumption. It employs a pub/sub data distribution mechanism that supports multiple concurrent downstream subscribers efficiently in real-time.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AT&T INTELLECTUAL PROPERTY I L P | 675 W PEACHTREE STREET SUITE 4000 ATLANTA GA 30308 |
International Classification(s)

- 2024 Application Filing Year
- H04L Class
- 14063 Applications Filed
- 888 Patents Issued To-Date
- 6.32 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Chen, Letian | Chesterfield, US | 6 | 11 |
# of filed Patents : 6 Total Citations : 11 | |||
Du, Christopher | San Ramon, US | 4 | 0 |
# of filed Patents : 4 Total Citations : 0 | |||
Jiang, Baofeng | Pleasanton, US | 81 | 509 |
# of filed Patents : 81 Total Citations : 509 | |||
Lim, Yew-Aik | Fremont, US | 4 | 0 |
# of filed Patents : 4 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H04L Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 20, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 20, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 20, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
