PHASE SHIFTER, MANUFACTURING METHOD THEREOF, AND ANTENNA
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Mar 13, 2025
app pub date -
Feb 24, 2023
filing date -
Feb 24, 2023
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A phase shifter includes first and second dielectric substrates opposite to each other and a plurality of phase shift units between the first and the second dielectric substrates; the phase shift unit includes first and second electrode layers and an adjustable dielectric layer between the first and the second electrode layers; orthographic projections of the first and second electrode layers on the first dielectric substrate at least partially overlap each other, and at least one accommodation cell of the phase shift unit is defined in a region where the orthographic projections of the first and second electrode layers on the first dielectric substrate overlap each other; the adjustable dielectric layer is in at least the accommodation cell; and cell gaps of the accommodation cells of at least a part of the plurality of phase shift units are different from each other.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
BOE TECHNOLOGY GROUP CO LTD | NO 10 JIUXIANQIAO RD CHAOYANG DISTRICT BEIJING 100015 |
International Classification(s)

- 2023 Application Filing Year
- H01P Class
- 332 Applications Filed
- 80 Patents Issued To-Date
- 24.10 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
CUI, Zhao | Beijing, CN | 56 | 41 |
# of filed Patents : 56 Total Citations : 41 | |||
DONG, Liwen | Beijing, CN | 63 | 595 |
# of filed Patents : 63 Total Citations : 595 | |||
HOU, Dongfei | Beijing, CN | 22 | 7 |
# of filed Patents : 22 Total Citations : 7 | |||
LI, Guoteng | Beijing, CN | 8 | 0 |
# of filed Patents : 8 Total Citations : 0 | |||
LI, Yuqiao | Beijing, CN | 7 | 0 |
# of filed Patents : 7 Total Citations : 0 | |||
LIU, Wengu | Beijing, CN | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
LV, Zhijun | Beijing, CN | 71 | 114 |
# of filed Patents : 71 Total Citations : 114 | |||
MENG, Detian | Beijing, CN | 38 | 15 |
# of filed Patents : 38 Total Citations : 15 | |||
QU, Feng | Beijing, CN | 208 | 54 |
# of filed Patents : 208 Total Citations : 54 | |||
SONG, Mengya | Beijing, CN | 21 | 3 |
# of filed Patents : 21 Total Citations : 3 | |||
ZHANG, Feng | Beijing, CN | 1002 | 28040 |
# of filed Patents : 1002 Total Citations : 28040 | |||
ZHAO, Zhonglan | Beijing, CN | 9 | 2 |
# of filed Patents : 9 Total Citations : 2 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01P Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 13, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 13, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 13, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
