HYDROSTATIC LOADING SYSTEM
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Mar 13, 2025
app pub date -
Sep 10, 2023
filing date -
Sep 10, 2023
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A hydrostatic loading system may comprise a dispensing assembly, a hose assembly, a cradle assembly, and a positioning assembly. The dispensing assembly may include a dispensing head, a sealing rim, and a container. The dispensing head may include an equalization port and a supply port. The hose assembly may be configured to connect to the dispensing head. The cradle assembly may be configured to engage the dispensing assembly. The positioning assembly may be configured to move the cradle assembly between a loading configuration and a dispensing configuration. The dispensing head may be configured to transfer air via the equalization port and transfer fluid via the supply port.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ACCURACY PAINTING LLC | 436 PINE VALLEY CT OXFORD MI 48371 |
International Classification(s)

- 2023 Application Filing Year
- B44D Class
- 57 Applications Filed
- 10 Patents Issued To-Date
- 17.55 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Kohler, Mitchell A | Oxford, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B44D Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 13, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 13, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 13, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
