Call Switching Method and Electronic Device
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Feb 6, 2025
app pub date -
Oct 25, 2024
filing date -
Oct 25, 2024
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A call handover method includes receiving a first message in a process of a first call between the first electronic device and a second electronic device. The first message is used to indicate handover of the first call to a third electronic device, and the third electronic device has a communication connection with the first electronic device; sending call hold signaling to a server. After receiving call hold feedback signaling from the server, holding a communication connection with the second electronic device through the server, and stopping sending call data of the first call to the server.
First Claim
all claims..Other Claims data not available
Family
Country | kind | publication No. | Filing Date | Type | Sub-Type |
---|
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
- Assignment data not available. Check PTO
International Classification(s)

- 2024 Application Filing Year
- H04W Class
- 12143 Applications Filed
- 594 Patents Issued To-Date
- 4.90 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Mao, Yuanze | Dongguan, CN | 10 | 2 |
# of filed Patents : 10 Total Citations : 2 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H04W Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Aug 6, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 6, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 6, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
