HIGH POWER CONVERTER TARGET ASSEMBLY, RELATED FACILITY AND METHOD TO PRODUCE BREMSSTRAHLUNG FOR PHOTONUCLEAR REACTIONS
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Feb 6, 2025
app pub date -
Dec 5, 2022
filing date -
Dec 5, 2022
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A facility for the production of radionuclides based photonuclear irradiation, comprising: an electron accelerator (1), producing an electron beam (2); a converter target assembly (21) with a converter target (20) that converts the electron beam (2) to Bremsstrahlung photons (15); a production target (17), irradiated by the Bremsstrahlung photons (15) and thereby producing said radionuclides.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
EIDGENÖSSISCHES INSTITUT FÜR METROLOGIE METAS | LINDENWEG 50 WABERN 3084 |
International Classification(s)

- 2022 Application Filing Year
- G21G Class
- 72 Applications Filed
- 17 Patents Issued To-Date
- 23.62 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
LÜTHI, Matthias | Herrenschwanden, CH | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
TÜRLER, Andreas | Bern, CH | 2 | 2 |
# of filed Patents : 2 Total Citations : 2 | |||
VAGHEIAN, Mehran | Bern, CH | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G21G Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Aug 6, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 6, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 6, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
