GEOENGINEERING CONSTRUCTIONS FOR USE IN RAILWAYS
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Jan 30, 2025
app pub date -
Sep 17, 2024
filing date -
Sep 17, 2024
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
There is disclosed a railway geogrid construction suitable for use with high speed trains to mitigate the increased impact of Rayleigh waves generated at high speed and/or over soft subgrades, the construction comprising: a track bed (e.g. having rails for a train) which defines a track located on a track plane; a mass of particulate material (e.g. aggregate) forming a layer located beneath the track plane; and a geogrid located in and/or below the particulate mass in a plane (geogrid plane) substantially parallel to the track plane where the average distance between the track plane and geogrid plane, measured perpendicular to both is greater than 0.65 metres.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
- TENSAR TECHNOLOGIES LIMITED
International Classification(s)

- 2024 Application Filing Year
- E01B Class
- 32 Applications Filed
- 5 Patents Issued To-Date
- 15.63 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Horton, Mike | Dunblane, GB | 18 | 151 |
# of filed Patents : 18 Total Citations : 151 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- E01B Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jul 30, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 30, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 30, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
