METHOD FOR DEALING WITH ANTICIPATED TRANSIENT WITHOUT SCRAM IN NUCLEAR POWER PLANT, AND SYSTEM THEREFOR

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20250029742A1
SERIAL NO

18715888

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for dealing with anticipated transient without scram in a nuclear power plant, and a system therefor. The method for dealing with anticipated transient without scream in a nuclear power plant, according to the present invention, comprises the steps of: identifying the pressure of a pressurizer; determining an accident level on the basis of the determined pressure of the pressurizer; and activating safeguards related to the pressure, according to the accident level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA HYDRO & NUCLEAR POWER CO LTD1655 BULGUK-RO YANGBUK-MYEON GYEONGJU-SI GYEONGSANGBUK-DO 38120

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
KWON, Sun Guk Daejeon, KR 3 0
LEE, Keun Seong Daejeon, KR 2 0
OH, Ji Yong Daejeon, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation