STEERING COLUMN SHROUD BREAK AWAY INTERFACE
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Dec 26, 2024
app pub date -
Sep 13, 2022
filing date -
Sep 13, 2022
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A portion of a shroud (30) is adapted to be secured to a steering column assembly (10). The portion of the shroud (30) includes a slot (46) for receiving a portion of a fastener (36) and an opening (48) of sufficient size that at least a portion of the fastener (36) is permitted to fit through to allow the shroud (30) to break away from the steering column assembly (10) upon an impact exceeding a threshold load. The shroud (30) is fastened to the steering column assembly (10) via a fastener (36) and a connection member that is joined to the column tube.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
NSK STEERING SYSTEMS AMERICA INC | 4200 GOSS ROAD ANN ARBOR MI 48105 |
International Classification(s)

- 2022 Application Filing Year
- B62D Class
- 2414 Applications Filed
- 1097 Patents Issued To-Date
- 45.45 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Hartman, David Ray | Brighton, US | 15 | 51 |
# of filed Patents : 15 Total Citations : 51 | |||
Read, Simon | Dexter, US | 47 | 554 |
# of filed Patents : 47 Total Citations : 554 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B62D Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jun 26, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jun 26, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jun 26, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
