STIFFENING GIRDER ERECTION METHOD OF GROUND-ANCHORED SUSPENSION BRIDGE

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20240352688A1
SERIAL NO

18762314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stiffening girder erection method of a ground-anchored suspension bridge is provided. Clips for all hanger rods of a space main cable suspension bridge are installed such that design center lines of the clips are located in a vertical plane. A first stiffening girder section is installed at a position away from a first tower at a preset distance in a longitudinal direction. A second stiffening girder section is installed at a position away from a second tower at the preset distance along the longitudinal direction. A plurality of third stiffening girder sections are installed one by one in a direction respectively from the first stiffening girder and the second stiffening girder toward a mid-span until a mid-span closure is completed. An azimuth angle of a main cable around a central axis thereof at each of the clips is measured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIV GUANGXINot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
HE, Jun Changsha, CN 231 1098
KE, Hongjun Changsha, CN 1 0
LI, Chuanxi Nanning, CN 2 2
WANG, Hu Nanning, CN 70 222
WANG, Jiping Wuzhou, CN 37 463

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation