SYSTEM AND METHOD FOR AUTONOMOUS OPERATION OF PIPELINE AND MIDSTREAM FACILITY SYSTEMS
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Oct 17, 2024
app pub date -
Jun 24, 2024
filing date -
Jun 24, 2024
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
In a system and method for supervisory management of fluid pipeline/LNG plant/gas plant/refinery/offshore oil and gas platform allowing simultaneous execution of commands at all control points, significantly increasing the speed at which an optimal set-point can be achieved in comparison to manual entry of commands. The pipeline/LNG plant/gas plant/refinery/offshore oil and gas platform control system has a cascade control configuration that can operate in conjunction with existing pipeline/LNG plant/gas plant/refinery/offshore oil and gas platform protection systems. The control room operator can activate automatic operation via the supervisory management system, and can subsequently command that the system switch back to manual control instantaneously. Dynamic models predict operating conditions of pipeline/LNG plant/gas plant/refinery/offshore oil and gas platform processes subject to constraints on pressure and other operating parameters. A steady-state optimization layer, operating in conjunction with real-time control, determines optimal states without operator intervention.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CRUX OPERATIONS CONTROL MANAGEMENT LIMITED | 4726 BOWNESS ROAD NW CALGARY ALBERTA T3B 0B4 |
International Classification(s)

- 2024 Application Filing Year
- G05B Class
- 1435 Applications Filed
- 75 Patents Issued To-Date
- 5.23 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Knott, Victoria | Calgary, CA | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 | |||
Otero, Fernando | Westfield, US | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 | |||
Shirt, Roger | Garibaldi Highlands, CA | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G05B Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Apr 17, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Apr 17, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 17, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
