ELECTRO-HYDRAULIC METERING UNIT
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Sep 19, 2024
app pub date -
Mar 13, 2024
filing date -
Mar 15, 2023
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An electrohydraulic steering system includes an electro-hydraulic metering unit and a control device. The electro-hydraulic metering unit includes an electric positioner operatively connected to the control device and a hand metering unit operatively connected to the electric positioner. The electro-hydraulic metering unit includes an intermediate electric positioner interface member operatively connected to the electric positioner and an intermediate interface member operatively connected to the hand metering unit and the intermediate electric positioner interface member.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AMATO ERIC | GREENFIELD MA |
International Classification(s)

- 2024 Application Filing Year
- B62D Class
- 1145 Applications Filed
- 56 Patents Issued To-Date
- 4.90 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Amato, Eric | Greenfield, US | 3 | 0 |
# of filed Patents : 3 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B62D Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Mar 19, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Mar 19, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 19, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
