REFRIGERATOR
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Sep 5, 2024
app pub date -
May 13, 2024
filing date -
Oct 2, 2018
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A refrigerator of the present invention comprises: a storage chamber for storing food; a cool air supplying means for supplying cool air to the storage chamber; a first tray which forms a part of an ice-making cell in which water is phase-changed to ice by the cool air; a second tray which forms another part of the ice-making cell and can be in contact with the first tray during an ice-making process; a water supply valve for adjusting a flow of the water supplied to the ice-making cell; a water supply amount detector for detecting the amount of water supplied to the ice-making cell; and a controller for controlling the water supply valve. The controller controls the water supply valve to supply water to the ice-making cell as much as a first reference water supply amount, for supplying water to the ice-making cell at a water supply position of the second tray. After finishing the water supply as much as the first reference water supply amount, the controller moves the second tray to an ice-making position and determines whether the water supply amount of the ice-making cell has reached a target water supply amount by using the water supply amount detector. When the water supply amount of the ice making cell has reached the target water supply amount, the controller starts ice-making, and when the water supply amount of the ice making cell has not reached the target water supply amount, the controller moves the second tray back to the water supply position and controls the water supply valve to supply water as much as a second reference water supply amount which is less than the first reference water supply amount.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LG ELECTRONICS INC | 128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336 |
International Classification(s)

- 2024 Application Filing Year
- F25C Class
- 110 Applications Filed
- 12 Patents Issued To-Date
- 10.91 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
BAE, Yongjun | Seoul, KR | 89 | 17 |
# of filed Patents : 89 Total Citations : 17 | |||
LEE, Donghoon | Seoul, KR | 255 | 3506 |
# of filed Patents : 255 Total Citations : 3506 | |||
LEE, Wookyong | Seoul, KR | 147 | 786 |
# of filed Patents : 147 Total Citations : 786 | |||
PARK, Chongyoung | Seoul, KR | 86 | 15 |
# of filed Patents : 86 Total Citations : 15 | |||
SON, Sunggyun | Seoul, KR | 93 | 22 |
# of filed Patents : 93 Total Citations : 22 | |||
YEOM, Seungseob | Seoul, KR | 110 | 149 |
# of filed Patents : 110 Total Citations : 149 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F25C Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Mar 5, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Mar 5, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 5, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
