5G Ultra-Wideband Monopole Antenna
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Aug 15, 2024
app pub date -
Apr 19, 2024
filing date -
Jul 3, 2020
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An ultra-wideband monopole antenna for 5G application is disclosed comprising a first quarter wavelength conductor and a second quarter wavelength conductor, for transmitting and/or receiving electromagnetic waves. A flat portion of the first quarter wavelength conductor and a flat portion of the second quarter wavelength conductor are preferably arranged and located perpendicular and intersecting to each other. Two curved wings of the first quarter wavelength conductor and two curved wings of the second quarter wavelength conductor are preferably arranged and located concentrically and having a same center. The first and second quarter wavelength conductors are joined to deliver ultra wideband frequency in the range of 600-960 MHz and 1710-6000 MHz.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AIRGAIN INC | CARLSBAD CA |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Wang, Daniel | Sydney, AU | 119 | 961 |
# of filed Patents : 119 Total Citations : 961 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01Q Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Feb 15, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 15, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 15, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
