METHOD FOR CONTROLLING A WIND POWER INSTALLATION
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jul 4, 2024
app pub date -
Dec 28, 2023
filing date -
Dec 29, 2022
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A method for control of a wind power installation which is connected to an electrical supply network and which has a rotor with rotor blades which are adjustable in terms of their blade angle, is able to be operated at a variable speed and is prepared for generating an installation power from wind, wherein a blade angle control is provided for adjusting the blade angles, a closed-loop speed control is provided for closed-loop control of the speed, a closed-loop power control is provided for limiting the installation power, and the wind power installation is able to be operated at an operating point which can be specified, wherein the operating point is characterized at least by the speed and the installation power comprises operating the wind power installation at a first operating point with a first blade angle, checking for a curtailment request, where a reduction in the speed and/or installation power is requested, and if there is a curtailment request, determining a new operating point as the target operating point depending on the curtailment request, wherein the target operating point is characterized by a target speed and a target installation power, and determining a setpoint blade angle as the target blade angle for the target operating point, wherein in order to change the blade angle to the target blade angle, a feedforward control blade angle, or a feedforward adjustment rate describing an adjustment rate of the blade angle, is specified via a feedforward control blade angle control process, wherein the feedforward control blade angle control process gives the feedforward control blade angle or the feedforward control adjustment rate directly to the blade angle control for implementation.
First Claim
all claims..Other Claims data not available
Family
Country | kind | publication No. | Filing Date | Type | Sub-Type |
---|---|---|---|---|---|
EP | B1 | EP4394177 | Dec 29, 2022 | Patent | Grant |
Type : Patent Sub-Type : Grant | |||||
Patent | VERFAHREN ZUM STEUERN EINER WINDENERGIEANLAGE | Jul 16, 2025 |
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
WOBBEN PROPERTIES GMBH | AURICH |
International Classification(s)

- 2023 Application Filing Year
- F03D Class
- 362 Applications Filed
- 138 Patents Issued To-Date
- 38.13 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Mühlenbrock, Henry | Hinte, DE | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 | |||
Schaper, Ulf | Staffhorst, DE | 12 | 50 |
# of filed Patents : 12 Total Citations : 50 | |||
von, Aswege Enno | Großefehn, DE | 16 | 5 |
# of filed Patents : 16 Total Citations : 5 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F03D Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jan 4, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 4, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 4, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
