Long-Span Corridor Comprising Two Sets Of Floor Cantilevered Inclined Trusses Combined With Suspension Cable Bearing And Assembly Method Thereof
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jun 20, 2024
app pub date -
Aug 25, 2023
filing date -
Aug 25, 2023
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A long-span corridor comprising two sets of floor cantilevered inclined trusses combined with suspension cable bearing is provided, including floor cantilevered inclined trusses, floor double-arch trusses, radial circumferential connecting structures, V-shaped support structures, corridor truss structures and suspension cable bearing structures; two trapezoidal tapering planar inclined trusses of each set of floor cantilevered inclined trusses are connected to each other through a combination of the floor double-arch trusses and through the radial circumferential connecting structures to form a single-set system; and the corridor truss structures are arranged between the two single-set systems. The present disclosure has the following beneficial effect: the complicated long-span steel corridor truss structure of of the bottom large-space multi-side and multi-point floor long cantilevered inclined truss and middle long-span region suspension cable bearing combined architectural modeling can be implemented, and this structure can full play the advantages of the bottom large-space and multi-way long-span.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
HANGZHOU CITY UNIVERSITY | 310015 NO 51 HUZHOU STREET HANGZHOU ZHEJIANG GONGSHU DISTRICT HANGZHOU CITY ZHEJIANG PROVINCE 310015 | |
ZHEJIANG INST OF ARCHITECTURAL DESIGN & RESEARCH | NO 18 ANJI ROAD XIACHENG DISTRICT ZHEJIANG PROVINCE HANGZHOU CITY 310030 |
International Classification(s)

- 2023 Application Filing Year
- E04B Class
- 669 Applications Filed
- 156 Patents Issued To-Date
- 23.32 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
CHENG, Junting | Hangzhou City, CN | 3 | 0 |
# of filed Patents : 3 Total Citations : 0 | |||
DING, Chao | Hangzhou City, CN | 40 | 43 |
# of filed Patents : 40 Total Citations : 43 | |||
QU, Haochuan | Hangzhou City, CN | 4 | 0 |
# of filed Patents : 4 Total Citations : 0 | |||
WANG, Zhen | Hangzhou City, CN | 578 | 1891 |
# of filed Patents : 578 Total Citations : 1891 | |||
YE, Jun | Hangzhou City, CN | 243 | 6444 |
# of filed Patents : 243 Total Citations : 6444 | |||
ZHAO, Yang | Hangzhou City, CN | 432 | 4884 |
# of filed Patents : 432 Total Citations : 4884 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- E04B Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Dec 20, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 20, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 20, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
