Aircraft power plant with interburner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12078353
APP PUB NO 20240175580A1
SERIAL NO

18058755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of operating an aircraft power plant having an interburner fluidly connected between a combustion engine and a turbine, includes: operating the combustion engine at an air-fuel ratio corresponding to a nominal air-fuel ratio to generate combustion gases; receiving the combustion gases generated by the combustion engine into the interburner; increasing a temperature of the combustion gases generated by a combustion chamber of the combustion engine by lowering the air-fuel ratio to an ignition air-fuel ratio lower than the nominal air-fuel ratio; injecting fuel into the interburner to cause ignition of a mixture of the combustion gases and the fuel received into the interburner; and after ignition of the interburner, increasing the air-fuel ratio above the ignition air-fuel ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRATT & WHITNEY CANADA CORP1000 MARIE VICTORIN BLVD LONGUEUIL QU J4G 1A1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Plamondon, Etienne Verdun, CA 22 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00