Flexible glass and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12024457
APP PUB NO 20240109803A1
SERIAL NO

17957664

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a flexible glass and manufacturing method thereof. The flexible glass includes a first straight part and a second straight part on two opposite ends thereof, a recess formed between the first straight part and the second straight part, and a pre-bent curve connection part disposed corresponding to the recess. The first straight part and the second straight part are not arranged on the same plane. The flexible glass has a first lateral side and a second lateral side, and the recess sinks from the first lateral side toward the second lateral side. Therefore, the flexible glass is provided with a greater bendability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHENFENG OPTRONICS CORPORATION24F -1 NO 236 SHIZHENG N 2ND RD XITUN DIST TAICHUNG CITY 40756

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liao, Kuan-Hua Taichung, TW 2 1
Liu, Yu-Wei Taichung, TW 32 107
Wong, Ching-Fang Taichung, TW 15 36
Zeng, Wei-Lun Taichung, TW 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00