METHOD AND SYSTEM FOR CONTROLLING ROBOT CONFIGURED WITH PLURALITY OF MODULAR ROBOTS, AND BUILDING IN WHICH ROBOT IS DISPOSED
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Feb 29, 2024
app pub date -
Nov 2, 2023
filing date -
May 3, 2021
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A method for controlling a robot having a plurality of modular robots for performing requested service-related tasks includes individually controlling each of the plurality of modular robots through a robot control system without interactions between the plurality of modular robots.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
NAVER CORPORATION | 95 JEONGJAIL-RO BUNDANG-GU SEONGNAM-SI GYEONGGI-DO 13561 13561 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
KIM, Inhyeok | Seongnam-si, KR | 5 | 51 |
# of filed Patents : 5 Total Citations : 51 | |||
PARK, Kay | Seongnam-si, KR | 10 | 15 |
# of filed Patents : 10 Total Citations : 15 | |||
YOON, Younghwan | Seongnam-si, KR | 3 | 2 |
# of filed Patents : 3 Total Citations : 2 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B25J Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Aug 28, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 28, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 28, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
