MOVABLE WATER-PERMEABLE PILE SPUR DIKE AND OPERATION METHOD THEREOF

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20240003107A1
SERIAL NO

17778718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention has disclosed a movable water-permeable pile spur dike and an operation method thereof. The pile spur dike includes a fixed rail, a plurality of movable rails, a plurality of movable water-permeable piles, pressure sensors, flow meters and a control platform, wherein the plurality of movable water-permeable piles are arranged on the fixed rail and the plurality of movable rails, the pressure sensor and the flow meter are arranged at each monitoring point on the outer side wall of each movable water-permeable pile, the control platform is used for analysis and calculation according to the monitoring data from each pressure sensor and each flow meter and adjusts the positions of each movable rail and each movable water-permeable pile, so that the water flow velocity and spur dike's pressure at each monitoring point are less than a corresponding flow velocity threshold value and pressure threshold value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOHAI UNIVERSITYNANJING CITY JIANGSU PROVINCE 210098 XIKANG ROAD NO 1 NANJING CITY JIANGSU PROVINCE 210098
CHINA THREE GORGES CORPORATIONWUHAN HUBEI 430010

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DAI, Huichao Beijing, CN 11 0
DAI, Jie Nanjing, Jiangsu, CN 73 95
GONG, Yiqing Nanjing, Jiangsu, CN 1 0
LI, Hanmei Nanjing, Jiangsu, CN 1 0
MAO, Jinqiao Nanjing, Jiangsu, CN 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation