Flood protection and fluid diversion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12018447
APP PUB NO 20230407587A1
SERIAL NO

17933315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure for use with a liner such as for use in a rapid deployment flood protection system for diverting a liquid. The structure may include frames connected by horizontal link bars. The frames may include a dam face, a base, and a brace, and may include a collapsed configuration with the braces and the bases aligned with the dam faces, and a configuration with the dam faces inclined at an acute angle relative to the bases and the braces extending between the bases and dam faces. The frames may include the base having a bump stop and a quick release pin for connecting the brace to the base. The frames may include a C-shaped brace and a sleeve extending between legs of the lower end of the C-shaped brace, and a quick release pin extendable through the C-shaped base and the sleeve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WATER DIVERSION LLC3082 S BLACK HORSE PIKE WILLIAMSTOWN NJ 08094

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alzheimer, Kristin Williamstown, US 2 0
Daniel, Jyothish Williamstown, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00