Upper for shoe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12102189
APP PUB NO 20230404213A1
SERIAL NO

17827005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An upper is provided for a shoe. The upper is basically provided with a base layer, a first reinforcement layer and a second reinforcement layer. The base layer includes a toe portion and a heel portion. The base layer has a joint free three-dimensional shape at least partly defining an interior foot receiving space. The first reinforcement layer is disposed on an outer side of a centerline of a toe-heel direction of the upper. The first reinforcement layer overlies a first heel area of the heel portion. The second reinforcement layer is disposed on an inner side of the centerline. The second reinforcement layer overlies a second heel area of the heel portion. The first reinforcement layer and the second reinforcement layer are separated at the heel portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIMANO INCJAPAN OSAKA SAKAI SAKAI DISTRICT OLD PINE TOWN THREE D 77 GA SAKAI-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Toshiaki Osaka, JP 65 417
Iuchi, Kadunori Osaka, JP 11 18
Kikuta, Junichi Osaka, JP 19 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00