Main stream reservoir ecological modulation method considering incoming water from interval tributaries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11866897
APP PUB NO 20230340742A1
SERIAL NO

17625311

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A main stream reservoir ecological modulation method considering incoming water from interval tributaries is provided. The method determines the contribution ratio of the incoming water from interval tributaries to first-day's water rising in a high-flow surge process and when to start ecological modulations of spawning ground sections, determines a river course routing method after a main stream and its tributaries joining and calibrating parameters, based on past hydrological data, performing river flow calculation on the discharge volume of upstream reservoirs and the flow after interval tributaries joining, and determines a main stream reservoir ecological modulation mode considering incoming water from interval tributaries.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA THREE GORGES CORPORATIONWUHAN HUBEI 430010
CHANGJIANG RIVER SCIENTIFIC RESEARCH INSTITUTENO 23 HUANGPU STREET WUHAN HUBEI 430000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Huichao Beijing, CN 11 0
Jiang, Dingguo Beijing, CN 4 0
Li, Qingqing Hubei, CN 12 159
Liu, Zhiwu Beijing, CN 7 17
Xu, Jijun Hubei, CN 5 3
Yang, Chunhua Hubei, CN 35 239
Yin, Zhengjie Hubei, CN 3 0
Zhao, Hanqing Beijing, CN 10 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00