Charging roll for electrophotographic apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12013650
APP PUB NO 20230314980A1
SERIAL NO

18330337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a charging roll, grooves regularly defining spirals are formed on an elastic body layer, with a groove width of 4 μm to 280 μm and a groove depth of 2 μm to 30 μm. On an outer peripheral surface of the elastic body layer, an area ratio between an area of a bottom surface of the groove and an area of a plane part is 0.3 to 2.4. The surface layer includes a binder polymer and a roughness forming particle. The roughness forming particle is arranged on the plane part and the groove. A surface roughness of the surface layer on the groove is 2 μm to 16 μm. A surface roughness of the entire surface layer is 5 μm to 26 μm. A thickness of the binder polymer covering the roughness forming particle on the groove is greater than that on the plane part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RIKO COMPANY LIMITED1 HIGASHI 3-CHOME KOMAKI-SHI AICHI 4858550

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishida, Masanori Aichi, JP 44 277
Saito, Yoshihiro Aichi, JP 103 1275
Ukai, Hiroshi Aichi, JP 14 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00