Series-parallel monorail hoist based on oil-electric hybrid power and controlling method thereof
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Mar 26, 2024
Grant Date -
Sep 28, 2023
app pub date -
Sep 30, 2022
filing date -
Mar 21, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A series-parallel monorail hoist based on an oil-electric hybrid power and a controlling method thereof. The monorail hoist includes a cabin, a hydraulic driving system, a lifting beam, a gear track driving and energy storage system, and a speed adaptive control system connected in series with each other and travelling on a track. The monorail hoist is capable of implementing an independent drive by an electric motor or a diesel engine in an endurance mode, a hybrid drive of the electric motor and the diesel engine in a transportation mode, and a hybrid drive of the diesel engine and a flywheel energy storage system in a climbing mode, according to different operating conditions that include conditions of an upslope, a downslope and a load. Power requirements for the monorail hoist under various operating conditions are satisfied, and the excess energy is recovered during the process of travelling.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CHINA UNIVERSITY OF MINING AND TECHNOLOGY | SCIENCE ACADEMY OF CHINA UNIVERSITY MINING AND TECHNOLOGY NO 1 UNIVERSITY ROAD XUZHOU JIANGSU 221116 | |
XUZHOU LIREN MONORAIL TRANSPORTATION EQUIPMENT CO LTD | 221000 NO 1 HUATAI ROAD NO 3 INDUSTRIAL PARK XUZHOU HI TECH INDUSTRIAL DEVELOPMENT ZONE JIANGSU PROVINCE XUZHOU CITY JIANGSU PROVINCE 221000 |
International Classification(s)

- 2022 Application Filing Year
- B61C Class
- 45 Applications Filed
- 15 Patents Issued To-Date
- 33.34 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Chen, Hua | Xuzhou, CN | 181 | 1732 |
# of filed Patents : 181 Total Citations : 1732 | |||
Du, Mai | Xuzhou, CN | 4 | 0 |
# of filed Patents : 4 Total Citations : 0 | |||
Lu, Hao | Xuzhou, CN | 120 | 248 |
# of filed Patents : 120 Total Citations : 248 | |||
Peng, Yuxing | Xuzhou, CN | 44 | 34 |
# of filed Patents : 44 Total Citations : 34 | |||
Tang, Yu | Xuzhou, CN | 219 | 955 |
# of filed Patents : 219 Total Citations : 955 | |||
Wang, Mingzhong | Xuzhou, CN | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 | |||
Xu, Zaigang | Xuzhou, CN | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 | |||
Zheng, Fuping | Xuzhou, CN | 8 | 0 |
# of filed Patents : 8 Total Citations : 0 | |||
Zhou, Gongbo | Xuzhou, CN | 60 | 92 |
# of filed Patents : 60 Total Citations : 92 | |||
Zhu, Zhencai | Xuzhou, CN | 86 | 108 |
# of filed Patents : 86 Total Citations : 108 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B61C Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 26, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 26, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 26, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
