Fuel pressure control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11852094
APP PUB NO 20230272757A1
SERIAL NO

18310990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel pressure control system for a fuel supply system of an injector of an engine includes: a booster pump for increasing a high-pressure system fuel pressure; a pressure reducing valve for reducing the high-pressure system fuel pressure; and a control device for controlling the booster pump and the pressure reducing valve. The control device includes a valve opening necessity determination unit for the pressure reducing valve. The control device executes a valve opening control for opening the pressure reducing valve. The control device further includes a restriction execution unit for performing a valve opening restriction control in the valve opening control to prevent a pressure exceeding a predetermined target portion threshold pressure from being applied to a target portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kondo, Takahiro Kariya, JP 92 683
Sano, Ryohei Kariya, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00