Method of manufacture of single crystal synthetic diamond material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12065756
APP PUB NO 20230272551A1
SERIAL NO

18143557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing synthetic diamond material using a chemical vapour deposition process, and a diamond obtained by such a method are described. The method comprises providing a freestanding synthetic single crystal diamond substrate wafer having a dislocation density of at least 107 cm−2. The synthetic single crystal diamond substrate wafer is located over a substrate holder within a chemical vapour deposition reactor. Process gases are fed into the reactor, the process gases including a gas comprising carbon. Crack-free synthetic diamond material is grown on a surface of the single crystal diamond substrate wafer at a temperature of at least 900° C. to a thickness of at least 0.5 mm and with lateral dimensions of at least 4 mm by 4 mm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELEMENT SIX LIMITEDISLE OF MAN IM99 6AQ
ELEMENT SIX (UK) LIMITEDGLOBAL INNOVATION CENTRE FERMI AVENUE HARWELL OXFORD DIDCOT OX11 0QR

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atkinson, Katharine Louise Didcot, GB 2 1
Friel, Ian Didcot, GB 19 256
Twitchen, Daniel James Didcot, GB 71 1396

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00