Generating boosted voltages with a hybrid charge pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11810626
APP PUB NO 20230260580A1
SERIAL NO

17670317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid charge pump is disclosed that employs novel arrangements of depletion-mode n-channel semiconductor devices and enhancement-mode p-channel semiconductor devices that eliminate or otherwise substantially reduce voltage drops that would otherwise occur across semiconductor device arrangements in existing charge pumps. As a result, the hybrid charge pump disclosed herein achieves the same output voltages as conventional charge pumps while requiring a reduced physical die area. Additionally, a hybrid charge pump arrangement disclosed herein employs a novel clocking scheme that reduces or eliminates reverse currents in the hybrid charge pump arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANDISK TECHNOLOGIES INC951 SANDISK DRIVE LEGAL DEP MILPITAS CA 95035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
G, V S N K Chaitanya Bengaluru, IN 2 0
Rehani, Ankit Burari, IN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00