DRAFT INFORMATION GENERATION DEVICE AND DRAFT INFORMATION GENERATION METHOD
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jul 27, 2023
app pub date -
Mar 31, 2023
filing date -
Oct 7, 2020
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The purpose of this disclosure is to easily calculate draft information with a simple configuration. The draft information generation device (10) comprises multiple range-finding sensors (20) and an information processor module (30). The range-finding sensor (20) is mounted on the side of a vessel (80) and measures the distance to water surface (91) using a range-finding signal. The information processor module (30) calculates draft height Hdr using the distance to the water surface (91) and the mold depth Hmd of the vessel (80).
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
FURUNO ELECTRIC CO LTD | NISHINOMIYA-CITY HYOGO 662-8580 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
BAJI, Hiroyuki | Takarazuka, JP | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G01C Class
- 0 % this patent is cited more than
- 2 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jan 27, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 27, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 27, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
